OUR PROJECTS
Practical Expertise Across Industries and Communities
Our project experience spans water and wastewater treatment, flood management, stormwater drainage, groundwater assessment and integrated water resource planning for industrial estates, residential developments, institutions and rural communities.
• SIDCO PHARMACEUTICAL COMPLEX — ALATHUR, TAMIL NADU
Common Effluent Treatment Facility
A 340 KLD Common Effluent Treatment Plant comprising two 170 KLD units, developed under the Department of Pharmaceuticals’ Cluster Development Programme for the Pharmaceutical Sector, Government of India.
The project includes effluent conveyance from individual units, primary electrolytic treatment, secondary biological treatment, tertiary treatment, reverse osmosis and evaporation. Treated water is distributed back to individual units through a hydropneumatic system, with RO reject conveyed to the oxidation pond.
The facility is operated and maintained by our team.
• PURA SCHEME — SEVEN VILLAGES AND SURROUNDING HAMLETS
Integrated Rural Water Resource Management
Comprehensive water resource management under the Government of India’s Providing Urban Amenities in Rural Areas scheme, covering seven villages and surrounding hamlets across a radius exceeding 50 kilometres.
The scope included flood mapping, inundation studies, water resource mapping, stormwater network analysis, new drain design, water safety and security plans, water supply modelling, sewerage planning, and design and engineering of water and sewage treatment plants.
The project was undertaken under ADB.
• THERVOY KANDIGAI INDUSTRIAL PARK — 1,000 ACRES
Stormwater Modelling and Flood Management
Detailed assessment of stormwater drainage adequacy and development of new drainage systems for a 1,000-acre industrial park.
The scope included macro- and micro-watershed analysis, flood mapping and development of micro waterbodies to maximise rainwater harvesting and reduce inundation.
The assignment was received through CUBE–IIT Madras and the Government of Tamil Nadu.
• DISNEY ASIANET STUDIOS — CHANDIROOR, KERALA
Flood Impact Study and Stormwater Drain Design
Flood impact assessment and stormwater drainage design for Disney Asianet Studios, undertaken under M. Moser Design Associates (India) Private Limited.
• SIDCO INDUSTRIAL ESTATE — THIRUMAZHISAI, 165 ACRES
Stormwater Network Assessment and Flood Mitigation Planning
Detailed assessment of the existing stormwater drainage network, identification of inadequacies and development of an integrated network incorporating existing and proposed drains.
The assignment included a detailed flood inundation study and preparation of a flood mitigation plan for the 165-acre industrial estate.
• MARG SWARNABHOOMI AND TRANQUIL COVE — ECR, CHENNAI
Integrated Stormwater Management and Flood Mapping
Integrated stormwater planning and flood mapping for township developments covering 55 acres and 612 acres.
The scope included maximising rainwater harvesting and creating micro waterbodies within the developments.
• POLYHOSE RUBBER INDIA PVT. LTD. — SIPCOT, IRUNGATTUKOTTAI
Stormwater Drainage and Rainwater Harvesting
Detailed assessment of stormwater drainage systems, network analysis and model development to maximise rainwater harvesting and prevent flood inundation.
The scope included the design of new rainwater conveyance systems.
• MARG BRINDAVAN — 16 ACRES, 1,848 APARTMENTS
Integrated Water Resource Management
Integrated water resource management, rainwater harvesting and stormwater drainage planning for a residential development comprising 1,848 apartments.
• OPALINE, OLYMPIA — OMR, CHENNAI
Groundwater Recharge and Integrated Water Management
Integrated water resource management for a 23-acre development comprising 2,000 apartments.
The scope included specialised micro-hydrogeological investigations, artificial recharge and creation of an on-site waterbody to help prevent saline water ingress.
• SRI CITY SEZ — TADA, ANDHRA PRADESH
Groundwater Assessment and Water Resource Planning
Hydrogeological investigations for groundwater assessment, together with planning for water resource storage and reuse.
• P. S. SRIJAN GROUP — 1,000-ACRE SEZ, TAMIL NADU
Water Resource Assessment and Flood Mapping
Reconnaissance study of water resource availability, preparation of water safety and water security plans, and flood mapping for a proposed 1,000-acre Special Economic Zone.
• SIDDHARTH HOUSING, NATURA — MEDAVAKKAM
Level Referencing and Artificial Recharge Feasibility
Establishment of mean sea level references and consultancy on the feasibility of managing treated sewage and stormwater through artificial recharge.
• ETA STAR GROUP — KARANAI VILLAGE
Borewell and Stormwater Management Feasibility
Feasibility assessment for borewell drilling and stormwater management through artificial recharge.
• ETA STAR GROUP — KATTUPAKKAM VILLAGE
Borewell and Stormwater Management Feasibility
Feasibility assessment for borewell drilling and stormwater management through artificial recharge.
• AUGUST VENTURES — BENGALURU
Groundwater Development and Artificial Recharge
Feasibility assessment for borewell drilling and stormwater management through artificial recharge methods.
• TATA HOUSING PVT. LTD. — MUMBAI, 55 ACRES
Groundwater Assessment and Rainwater Management
Hydrogeological investigations for groundwater assessment across a 55-acre development.
The scope included rainwater harvesting and artificial recharge planning through effective flood routing and stormwater drainage networking within the complex.
• PHOENIX HODU DEVELOPERS — CHENNAI, 40 ACRES
Micro-Hydrogeological Investigations
Detailed micro-hydrogeological investigations for a 40-acre development, including assessment of artificial recharge opportunities.
• ADINATH FOUNDATIONS, SERENA — RAJAKILPAKKAM, CHENNAI
Groundwater Assessment and Recharge
Hydrogeological investigations for groundwater assessment and artificial recharge of excess water.
• SHANTHINIKETAN ASHIANA, PROJECT SERENE — MANNIVAKKAM, CHENNAI
Integrated Water Management for 686 Apartments
Comprehensive consultancy covering water sourcing, hydrogeological investigations, rainwater management, and design and engineering of water and sewage treatment plants.
The scope included capital and operating cost estimates, cost-benefit analysis of water management alternatives, and preparation of an integrated water management plan.
• RAJAGIRI HOSPITALS — KERALA
Groundwater Assessment and Artificial Recharge
Hydrogeological investigations for groundwater assessment and identification of artificial recharge locations.
• ONGC — CHENNAI, 22 ACRES
Rainwater Management and Stormwater Drainage Assessment
Hydrogeological investigations and preparation of a detailed rainwater management plan for a 22-acre complex.
The scope included stormwater network analysis, drainage adequacy assessment and basic design for a new stormwater drainage network.
• SHELTREX — ORAGADAM, 103 ACRES
Integrated Water Resource Management for a Residential Township
Integrated water resource management for a 103-acre township comprising 7,600 apartments, beginning with Phase 1, covering approximately 3,000 apartments across 26.6 acres in Clusters A to F.
The scope included water resource planning, hydrogeological investigations, water and sewage treatment plant design and engineering, capital and operating expenditure budgeting, and overall plumbing system design.
OUR PROJECTS
Flood Management and Integrated Water Resource Solutions
MV Environmental Solutions has served more than 100 customers across industrial, residential, institutional and community developments. Our project experience includes flood risk assessment, stormwater drainage design, rainwater harvesting and integrated water resource management.
• SIPCOT INDUSTRIAL ESTATE — THERVOY KANDIGAI, TAMIL NADU
Project Area: 1,000 Acres
Integrated Flood and Stormwater Management
Development of an integrated flood and stormwater management plan to prevent inundation while capturing and reusing rainwater to support industrial water demand.
Scope of Work:
– Flood mapping of the wider area and detailed mapping of the industrial zone.
– Macro-watershed analysis.
– Rainfall modelling and runoff calculations.
– Development of floodwater routing systems.
– Assessment of existing stormwater drainage adequacy.
– Design and sizing of new stormwater drains.
– Preparation of a Detailed Project Report on surface water optimisation and rainwater harvesting for industrial use.
• SIDCO INDUSTRIAL ESTATE — THIRUMAZHISAI, CHENNAI
Project Area: 215 Acres
Comprehensive Flood Mitigation Planning
Preparation of a comprehensive flood mitigation plan to address monsoon inundation and water ingress into factory shop floors, including alternative stormwater discharge routes.
Scope of Work:
– Assessment of existing conditions and identification of drainage blockages.
– Evaluation of existing stormwater drainage capacity.
– Rainfall modelling and runoff calculations.
– Macro-watershed analysis and detailed flood mapping.
– Development of floodwater routing systems.
– Design and sizing of new stormwater drains.
– Planning and sizing of micro waterbodies for rainwater storage, reuse and flood mitigation.
– Preparation of a flood mitigation plan and Detailed Project Report on surface water optimisation.
• SRF LTD. — MANALI, CHENNAI
Project Area: 137 Acres
Flood Risk Assessment and Mitigation
Comprehensive assessment of a factory site that experienced flood inundation reaching approximately 9 feet.
Flood risk, flood sources and watershed conditions were analysed to understand the causes of inundation. A flood mitigation plan was developed and implemented at the factory.
The plan included redesigning drainage and flood routing systems, modifying outfall arrangements and providing flood barriers to protect key buildings.
• CHARTER ONE — “AMERICAN CITY,” NOIDA
Project Area: 100 Acres
Flood Risk Analysis and Flood Management Planning
Flood risk assessment for the project site, supported by a wider Yamuna River Basin study covering a development area exceeding 1,800 acres.
Scope of Work:
– Detailed watershed and catchment analysis.
– Assessment of flood flow pathways in relation to rural and urban development.
– Site outfall analysis.
– Audit and capacity assessment of existing drainage networks.
– Site-specific rainfall and runoff analysis.
– Flood risk assessment under different rainfall, runoff and outfall saturation scenarios.
– Development of a comprehensive flood management plan, including design, sizing and costing.
• ASIANET STUDIOS — AROOR, KERALA
Project Area: 34 Acres
Flood Inundation Study and Development Level Assessment
Flood inundation assessment to establish Finished Ground Levels (FGL) and Finished Floor Levels (FFL) for a development close to a flood zone.
Scope of Work:
– Macro-watershed analysis.
– Flood mapping and flood zone identification.
– Verification of site boundaries in relation to flood zones.
– Detailed rainfall and runoff analysis and modelling.
– Design and sizing of the site’s stormwater drainage system.
– Determination and verification of proposed ground and floor levels to address flood risk.
• HSBC HEADQUARTERS — HERITAGE BUILDING, MUMBAI
Flood Risk Assessment and Flood Management Planning
Flood risk analysis and flood management planning for the redevelopment of an existing heritage building.
Scope of Work:
– Assessment of existing systems.
– Detailed outfall analysis.
– Determination of potential flood risk.
– Preparation of flood mitigation measures.
– Development of a flood management plan.
• TANFAC INDUSTRIES — CUDDALORE, TAMIL NADU
Project Area: 60 Acres
Industrial Flood Risk Assessment and Mitigation Planning
Comprehensive assessment of flooding and inundation during rainfall and monsoon events.
Scope of Work:
– Flood source identification and analysis.
– Flood risk assessment.
– Outfall analysis.
– Evaluation of external outfall failure conditions.
– Assessment of internal drainage failure conditions.
– Development of an alternative flood management plan based on meteorological data and runoff analysis.
The plan was developed to address the causes of inundation and improve flood protection for the factory.
• POLYHOSE RUBBER INDIA PVT. LTD. — SIPCOT, IRUNGATTUKOTTAI
Project Area: 11 Acres
Stormwater Management and Rainwater Harvesting
Assessment and design of stormwater drainage and rainwater harvesting systems within the industrial premises.
Scope of Work:
– Macro-watershed analysis of contributing catchments.
– Detailed rainfall and runoff analysis and modelling.
– Assessment of existing stormwater drainage adequacy.
– Design and sizing of new stormwater drains.
– Design and sizing of rooftop rainwater harvesting systems.
– Sizing of rainwater harvesting structures within the site.
• MARG — KARAIKAL PURA PROJECT
Integrated Water Resource Management for Karaikal Town and Surrounding Villages
A project under the Ministry of Rural Development, funded by ADB and aligned with the PURA vision of Dr. A. P. J. Abdul Kalam.
Scope of Work:
– Water source investigations, including hydrogeological studies.
– Assessment of existing raw water supply systems and borewell yield testing.
– Preparation of water demand and water source assessments.
– Development of water safety and water security plans.
– Detailed flood mapping.
– Comprehensive flood routing and macro-stormwater system design.
– Design and engineering of water and wastewater treatment plants, including recycling systems.
– Preparation of an integrated water resource management report covering source water, rainwater, wastewater and reuse.
• MARG SWARNABHOOMI
Project Area: 612 Acres
Integrated Water Resource Management and Flood Risk Studies
Integrated water resource management modelling for the entire development, addressing water demand, supply, treatment, distribution and reuse.
Scope of Work:
– Water demand and supply analysis.
– Treatment plant design, sizing, costing and location planning.
– Water distribution system planning.
– Maximisation of rainwater harvesting.
– Modelling of water reuse systems.
– Extensive flood zone modelling and flood risk studies.
The project addressed groundwater extraction restrictions associated with the site’s recorded CGWB “Dark” category classification.
• MARG TRANQUIL COVE — CHENNAI
Project Area: 55 Acres
Integrated Water Management and Stormwater Design
Comprehensive integrated water resource management modelling, supported by detailed rainwater harvesting and stormwater management design.
• MARG BRINDAVAN — CHENNAI
Project Area: 16 Acres
Integrated Water Resource Management
Comprehensive water management planning covering source water, rainwater, stormwater drainage, treatment and reuse.
The scope also included measures to address demand–supply gaps and the development of artificial recharge systems.
• OPALINE, OLYMPIA — OMR, CHENNAI
Project Area: 23 Acres
Integrated Water Resource Management
Comprehensive modelling and engineering to support water self-sufficiency and sustainable water management.
Scope of Work:
– Hydrogeological investigations and borewell yield testing.
– Water demand, supply and gap analysis.
– Design, engineering and costing of water and wastewater treatment systems.
– Water reuse and rainwater harvesting system design.
– Detailed stormwater drainage and routing design.
– Outfall analysis.
– Preparation of water safety and water security plans.
• P. S. SRIJAN GROUP — PROPOSED SEZ, TAMIL NADU
Project Area: 1,000 Acres
Water Resource Balance Assessment
Reconnaissance study of the proposed development’s water resource balance, including macro-watershed analysis and rainwater harvesting assessment.
• SHANTHINIKETAN ASHIANA — PROJECT SERENE, MANNIVAKKAM, CHENNAI
Project Area: 14 Acres | 686 Apartments
Integrated Water Resource Management Consultancy
Comprehensive consultancy covering water sourcing, hydrogeological investigations and rainwater management.
The scope included design, engineering and costing of water and sewage treatment plants, operating cost calculations, cost-benefit analysis of alternative water management models and preparation of an integrated water management plan.
• ETA STAR GROUP — KARANAI VILLAGE
Borewell Feasibility and Stormwater Management
Preparation of a feasibility report for borewell drilling and stormwater management through artificial recharge methods.
• ETA STAR GROUP — KATTUPAKKAM VILLAGE
Borewell Feasibility and Stormwater Management
Preparation of a feasibility report for borewell drilling and stormwater management through artificial recharge methods.
• PGP INSTITUTIONS — NAMAKKAL
Project Area: 104 Acres
Integrated Water Resource Management Studies
Comprehensive studies addressing groundwater availability, existing treatment facilities, sewage conveyance and rainwater harvesting.
Scope of Work:
– Hydrogeological investigations for groundwater assessment.
– Detailed audit of existing water treatment facilities.
– Recommendations for treatment system improvements.
– Design, engineering and Bill of Quantities for sewage transfer and conveyance systems serving the boys’ and girls’ hostels.
– Maximisation of rainwater harvesting at a water-deficient site.
• MANTRI BUILDERS — SYNERGY DEVELOPMENT
Hydrogeological Assessment and Artificial Recharge Planning
Detailed hydrogeological assessment and water pathway modelling to develop an artificial recharge approach for excess water and rainwater, supporting borewell replenishment.
• SHELTREX — ORAGADAM
Project Area: 103 Acres | 7,600 Apartments
Integrated Water Resource Management for a Residential Township
Comprehensive water resource management for the township, beginning with Phase 1, covering approximately 3,000 apartments across 26.6 acres in Clusters A to F.
Scope of Work:
– Water resource planning.
– Hydrogeological studies.
– Water and sewage treatment plant design and engineering.
– Capital and operating expenditure budgeting.
– Overall plumbing system design.